The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › EVPN

EVPN · Ethernet VPN

The BGP-based control plane that tells a VXLAN fabric which endpoints live behind which switch; the standard overlay control plane in multi-tenant Ethernet designs.

← All terms