EML · Electro-absorption Modulated Laser
An indium-phosphide laser with an integrated modulator, used in single-mode 800G and 1.6T pluggable optics. Supply ran well short of demand in 2026.
Also written as: EMLs
Context: Parts 8
An indium-phosphide laser with an integrated modulator, used in single-mode 800G and 1.6T pluggable optics. Supply ran well short of demand in 2026.
Also written as: EMLs
Context: Parts 8