The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Dry cooler

Dry cooler

A finned coil that rejects heat to ambient air without evaporating water, saving water at the cost of efficiency on hot days.

← All terms