The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › DRUPS

DRUPS · Diesel Rotary UPS

A UPS built from a motor-generator, a flywheel or kinetic store, and a diesel engine on one shaft. The flywheel carries the load for seconds until the engine takes over; there is no battery string.

← All terms