The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › DIMM

DIMM · dual in-line memory module

The socketed module that carries host DRAM; in a liquid-cooled AI rack DIMMs are part of the residual air-cooled load and a prime harvest target at decommission.

← All terms