DDTL · Delayed-Draw Term Loan

A loan committed up front but drawn in stages as construction milestones are hit, matching financing to capital needs.

Current numbers

$2.6B; Term SOFR + 5.50%CoreWeave DDTL 5.5 — published August parent-guaranteed termsas of 2026-08-10 · register ↗
$8.5B facility (initial ~$7.5B borrowing capacity, $8.5B at asset stabilization); SOFR+2.25% floating / ~5.9% fixed; matures March 2032CoreWeave DDTL 4.0 (Mar 2026) — investment-grade rated and non-recourse, against the parent-guaranteed DDTL 5.5 beside itas of 2026-03 · register ↗
15% effective / ~5.9% fixed-tranche closing quoteCoreWeave, March 2026: 15% effective rate on DDTL 1.0 versus ~5.9% closing fixed tranche on DDTL 4.0; different rate measuresas of 2026-03 · register ↗