CFD · Computational Fluid Dynamics

Simulation of airflow and heat that engineers use to design and verify data-center cooling.

Current numbers

~115 / ~17 kWHPE GB200 NVL72 heat split, liquid vs air per rack; the CFD must validate both loopsas of 2025 · register ↗