BOM · Bill of Materials
The itemized list of every part in a system or build; design changes ripple through it into cost, lead times, and power budgets.
Current numbers
about 840 TB/dayEncoded host-write duty in the stated storage BOM case; illustrative assumptions
$270k → $256.4k per nodeHistorical H100 compute-node BOM before/after host and DPU optimization (SemiAnalysis, October 2024)