The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › Blowdown

Blowdown

Periodically draining concentrated mineral-laden water from a cooling tower to control scale, a key water loss.

Current numbers

~85%typical open-tower evaporative share of withdrawn water that is consumed (leaves as vapor); the site’s fraction follows blowdown, drift and cycles of concentrationas of 2025 · register ↗

← All terms