The Definitive Guide toAI Data Centers
Ask the GuideAboutAccount
Guide › Glossary › BBU

BBU · Battery Backup Unit

Rack-level battery that rides through power dips and absorbs sudden GPU load swings before the BESS or genset reacts.

Rack-mounted battery providing short ride-through and load-transient smoothing for AI racks.

Also written as: Battery Backup Unit

Current numbers

<2 ms ramp after ~2 ms qualificationORv3 BBU v1.4 ramp to full power after the low-voltage qualification interval (OCP specification, September 2023); ≥46 V bus requirementas of 2023-09-12 · register ↗
up to 97% VFI vs >99% ECO/VFDLiebert EXL S1 UPS efficiency in double-conversion (VFI) and ECO modes; a central UPS figure, not the ORv3 BBUas of 2020-01 · register ↗

← All terms