ASHRAE

The engineering society whose thermal guidelines define the temperature and humidity envelopes for IT equipment.

Current numbers

Addendum b approved 27 February 2026ASHRAE CDU test and rating boundary: external head and electrical inputsas of 2026-02-27 · register ↗
G0-2019 / G1.1-2025 / Std 202-2024; G1.6P proposedASHRAE register: published process/HVAC&R references and proposed data-center guideline; freeze the project's adopted editionsas of 2026 · register ↗
W17–W45+ASHRAE liquid classes by max supply water temp (17/27/32/40/45 °C, plus W+); all share a 2 °C lower limitas of 2025 · register ↗