Calculators › GPU TCO & $/GPU-hour

GPU TCO & $/GPU-hour

Estimate owned cost per productive GPU-hour — server capex over its depreciation life, installed-to-active allocation, electricity at TDP × PUE, opex, and a facility charge per kW of IT (standalone default $210/kW-month, inside CBRE's Q1 2026 Northern Virginia asking range of $190–235) — then compare against the rate you would actually sign: a contract or reserved rental (H100 ~$2.00/GPU-hr, the SemiAnalysis InferenceX 'retail' rate (its glossary defines retail as a three-year reservation price)), not the on-demand list.

ScenarioNVIDIA GB300 NVL72 · 56 active / 72 installed GPUs · 1 racks · 0.14 MW IT · $9M programguide defaults (as of 2026-09)Edit the shared scenario →

GPU TCO & cost-per-GPU-hour

$6.11 / active GPU-hr · server ownership, energy and facility charge
Annual cost / active GPU$37,450
· Depreciation$22,320
· Energy$1,943
· Opex$8,928
· Facility charge$4,259
· Installed-to-active allocation1.286× across all four cost lines
Breakeven utilization vs contract rental86%

The facility charge puts space and power delivery into the owned cost, so it compares like-for-like with a rental rate that already includes them; energy is billed separately at PUE. Compare against the contract rate you would actually sign, not an on-demand list price. Ownership beats that rate only above the breakeven utilization computed from your own inputs — below it a debt-financed cluster bleeds cash → Ch 1.8.

Worked decision — stated assumptions

All ledger inputs are assumed teaching values chosen to exercise this chapter’s method; they are not market quotes, OEM performance claims or operating records. Arithmetic uses the full entered precision.

Assumed inputs
InputValue
Server cost240000 $
GPUs / server8 GPUs
Depreciation life3 yr
GPU TDP1000 W
Server power multiplier1 × GPU TDP
PUE1 ratio
Annual-average IT load100 % of nominal
Power price0.1142 $/kWh
Owned-use utilization50 %
Installed / active allocation1.25 ×
Opex5 %/yr
Facility / colocation charge0 $/kW-month IT
Contract rental comparator4 $/GPU-hr

Illustrative server-ownership decision: assume $30,000 per installed GPU, three-year straight-line cost allocation, $1,000 annual energy, annual opex equal to 5% of purchase cost, and 1.25 installed GPUs per active GPU. Annual cost per active GPU is (30,000 / 3 + 1,000 + 1,500) × 1.25 = $15,625. At 50% productive use, divide by 4,380 hours: $3.57 per productive GPU-hour.

An assumed like-for-like $4/hour rental crosses that cost at 15,625 / (8,760 × 4) = 44.6% utilization. Above that point ownership wins this stated numerator; below it rental wins. With all other inputs fixed, five- and seven-year ownership lives reduce the result to $2.43 and $1.94/hour. These are life sensitivities, not evidence that the fleet earns for those periods. The facility charge is set to zero here to isolate the server; a rental rate includes powered, cooled space, so enter the facility's capital recovery per kW-month and reconcile services outside either quote before making a full-service purchase decision.

At 40% productive use, ownership costs $4.46 per productive GPU-hour and the assumed $4 rental wins. Change productive use, not the independent electrical-load assumption.

Guide derivation. Method and handoff: Chapter 1.8 — Business Models, Economics & ROI.

These are transparent screening estimates, not final designs, financial advice, or project approvals. Replace every default with current project data and have the responsible project authorities validate the result. You can save, share a permalink, or export to CSV; see the full calculator suite.