Power Usage Effectiveness · PUE

Total facility power divided by IT power; the headline data-center efficiency ratio, lower is better.

Current numbers

~1.09Google fleet-wide trailing-12-month PUE; best sites ~1.04 (quarterly swings 1.08-1.11 with season)as of 2026-Q1 · register ↗
~2.3 GWVoltaGrid generation for Vantage's ~1.4 GW IT load (~64% overbuild) — the PUE x redundancy x derate stack made concreteas of 2026 · register ↗
500 kWEED Article 12 reporting threshold; PUE+WUE+ERF+REF filed annually by 15 May to the EU databaseas of 2026 · register ↗