Co-Packaged Optics · CPO

Bringing optical engines into the chip package to push high-speed links further than copper allows.

Current numbers

~0.5%CPO share of AI-data-center optical modules in 2026 — a top-of-fabric, highest-pressure-link technology spreading outwardas of 2026 · register ↗
~30W → ~9Wper-1.6T-link power, pluggable DSP vs co-packaged optics — ~3.5x energy saving, 10x resilienceas of 2026 · register ↗
~3.5xCPO power efficiency gain vs pluggable optics (NVIDIA silicon photonics; ≈70% optical-interconnect power cut, Broadcom Davisson)as of 2025–2026 · register ↗