Battery Backup Unit · BBU

Rack-mounted battery providing short ride-through and load-transient smoothing for AI racks.

Current numbers

~50% / 2–3%battery-capacity cut and double-conversion-loss cut from distributed BBU + supercaps vs central 2Nas of 2026 · register ↗
<2 msORV3 BBU ramp to full power on 48.5 V busbar droop; busbar held ≥46 V; PSU ≥97.5% (30–100% load)as of 2025 · register ↗
<5 msrack BBU (OCP ORv3, 5+1 redundant) switchover — backup energy migrating down to the rack/siliconas of 2025 · register ↗